how about a light house
http://gsaauctions.gov/gsaauctions/aucitsrh/
http://gsaauctions.gov/gsaauctions/aucitsrh/
u dont have to remove u get a 25 yr Leese with the army core of engineers.
and it is on the nat registry of historical land marks so u can almost guarantee never ending renewals. it this point it has to be cheaper than a slip at a local marina
? I would assume that break water drops fast cant see why a guy could not drop 3 pylons down and put 30ft of dock parallel to breakwater.
but like anything with the government involved it would prob require 785 pages of red tape and 2 yrs of calls
u dont have to remove u get a 25 yr Leese with the army core of engineers.
and it is on the nat registry of historical land marks so u can almost guarantee never ending renewals. it this point it has to be cheaper than a slip at a local marina