indy_500
Well-known member
Had a fun day today, only took about 4 hours and im' only 3/4 of the way done! i'm putting 29 holes in each side and i have 29 on the left and 15 on the right so far. I've gone thru 3 of the bolts that i use for the dimple dying. i have 2 left. i get 15 holes per bolt. and, i found the hole in my heat exchanger, she's pretty ugly. i got a long week ahead of me of tinkering on the sled (spring break = 9 days off of school!) i will be taking some tunnel decals off, maybe tinkering with the suspension and polishing/cleaning. and sometime within the next 10 days i might get the heat exchanger welded and the new track on! (sorry for the poor quality of the heat exchanger pic)