Friday I had a load of road gravel delivered (15yds) My excavator was busy so I spread it myself by hand, Took me most of Friday, That's a lot of gravel but it was really needed to level out the approach to the garage, I was pleased with the result. Saturday was framing and Sunday also, Put up one 40ft wall, 10ft high 2 x 6 construction. So, a good start, need to finish the lower level framing in the next couple of days, my trusses get delivered on Wednesday. The front part of the garage will be 10ft high, to accomodate a 8 ft garage door, back part, my shop will be 9ft high cielings. Building this myself, my wife helped me raise the walls, Thank you Honey!